PRICING
FREE DESIGN AND FREE ESTIMATES*
OUR PROCESS
STEP 1:
SIMPLY BROWSE OUR LANDSCAPE PACKAGES AND AL ACARTE SERVICES BELOW AND SELECT THE ONE THAT BEST FITS YOUR NEEDS.
STEP 2:
CONTACT US AT 406-980-1866 FOR A FREE ONSITE CONSULTATION TO VALIDATE PACKAGE PRICING. YOU MAY ALSO FILL OUT THE CONTACT US FORM AT THE BOTTOM
STEP 3:
ONCE SERVICES AND PRICING ARE VALIDATED WE WORK WITH YOU TO PROVIDE FREE DESIGN OF YOUR PACKAGE CUSTOM TO YOUR VISION AND ISSUE A CONTRACT WITH ALL TERMS AND CONDITIONS ALONG WITH INSURANCE CERTIFICATE.
STEP 4:
ONCE CONTRACTS ARE SIGNED WE MOVE INTO ACTION TO MAKE YOUR DREAM A REALITY.
IF YOU DON’T SEE A PACKAGE THAT COVERS WHAT YOU NEED, DON’T WORRY! SIMPLY CALL US AT 406-980-1866 FOR A FREE ESTIMATE AND COMPLETELY CUSTOMIZED PRICE. WE OFFER DESIGN SERVICES AS WELL.
LANDSCAPE PACKAGES & AL ACARTE SERVICES
THE “FINE PRINT”
*PUBLISHED PRICING IS NON BINDING AND WILL ONLY BE BINDING WITH AN EXECUTED CONTRACT OUTLINING ALL TERMS AND CONDITIONS AND AFTER AN ONSITE CONSULTATION AND ASSESSMENT OF EXISTING SITE CONDITIONS. PRICES ARE NOT VALID WITH ANY OTHER OFFERS. WE RESERVE THE RIGHT TO CHANGE/MODIFY THIS PUBLISHED PRICING AT ANYTIME BUT WE OFFER THESE IN GOOD FAITH AS AVERAGE COST OF SERVICES OF WORK WE HAVE COMPLETED. IMAGES BELOW DO NOT NECESSARILY REPRESENT THE FULL CONTEXT OF THE PACKAGE INCLUSIONS AND ARE REFERENCE ONLY. CONTACT US FOR FURTHER DETAILS ON EACH PACKAGE.
WHAT WOULD CHANGE THESE PRICES? SEE BELOW EXAMPLES - LIST IS NOT ALL INCLUSIVE AND OTHER EXAMPLES MAY EXIST THAT ARE NOT LISTED OR EXPRESSLY IDENTIFIED. ALL TERMS AND CONDITIONS WILL BE IDENTIFIED IN A SIGNED CONTRACT PRIOR TO COMMENCEMENT OF WORK AND A SITE CONSULTATION IS REQUIRED.
SOIL CONDITIONS (ie; ROCK VS. CLAY), DISTANCE AWAY FROM THREE FORKS (PRICING IS GOOD UP TO 29 MILES FROM THREE FORKS, MATERIAL/PLANT/SHRUB PRICES VARY, EXISTING CONDITIONS (WE HAVE NOT INCLUDED DEMOLITION OF EXISTING LANDSCAPE), QUANTITY CHANGES FROM PACKAGE PRICING INCLUSIONS, MARKET PRICING FLUCTUATIONS OF MATTERIALS AND SUPPLIES, TERRAIN - ACCESS, EXPEDITED TIMING, UNIQUE PROPERTY CONDITIONS THAT IMPACT PRODUCTION ETC…
PRICING & PACKAGES
-

LIMITED LANDSCAPE PACKAGE
$5,251 AVG*
GENERAL INCLUSIONS:
MINIMAL GROUND PREP, 10 PLANTS/SHRUBS, LIMITED DRIP SYSTEM, 100 LF EDGING, 10 CY OF ROCK OR MULCH AND LABOR /EQUIPMENT FOR FULL INSTALLATION
-

BASIC LANDSCAPE PACKAGE
$9,968 AVG*
GENERAL INCLUSIONS:
MINIMAL GROUND PREP, 15 PLANTS/SHRUBS, LIMITED DRIP SYSTEM, 150 LF OF EDGING, 15 CY OF ROCK OR MULCH, THREE 2” TREES OF YOUR CHOICE, AND LABOR/EQUIPMENT FOR FULL INSTALLATION
-

BASIC + LANDSCAPE PACKAGE
$14,997 AVG*
GENERAL INCLUSIONS:
MINIMAL GROUND PREP, 15 PLANTS/SHRUBS, LIMITED DRIP SYSTEM, 150 LF OF EDGING, 15 CY OF ROCK OR MULCH, THREE 2” TREES OF YOUR CHOICE, 2 SPRINKLER ZONES, 1 DRIP ZONE, 1,500 SF OF SOD AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

PRIMO LANDSCAPE PACKAGE
$18,849 AVG*
GENERAL INCLUSIONS:
LIMITED GROUND PREP, 20 PLANTS, 200 LF OF EDGING, 20 CY YARDS OF ROCK/MULCH, THREE 2” TREES OF YOUR CHOICE, 3 SPRINKLER ZONES, 1 DRIP ZONE, 2,000 SF OF SOD AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

SELECT LANDSCAPE PACKAGE
$24,249 AVG*
GENERAL INCLUSIONS:
LIMITED GROUND PREP, 25 PLANTS, 250 LF OF EDGING, 25 CY YARDS OF ROCK/MULCH, FIVE 2” TREES OF YOUR CHOICE, 4 SPRINKLER ZONES, 1 DRIP ZONE, 2,500 SF OF SOD AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

PRIME LANDSCAPE PACKAGE
$30,877 AVG*
GENERAL INCLUSIONS:
LIMITED GROUND PREP, 30 PLANTS/SHRUBS, 300 LF OF EDGING, 30 CY OF ROCK/MULCH, FIVE 2” TREES OF YOUR CHOICE, 5 SPRINKLER ZONES, 1 DRIP ZONE, 3,500 SF OF SOD AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

CHOICE LANDSCAPE PACAKAGE
$56,125 AVG*
GENERAL INCLUSIONS:
LIMITED GROUND PREP, 30 PLANTS/SHRUBS, 300 LF OF EDGING, 30 CY OF ROCK/MULCH, FIVE 2” TREES OF YOUR CHOICE, 3 SPRINKLER ZONES, 1 DRIP ZONE, 2,000 SF OF SOD, 750 SF OF FLAGSTONE, 15 MOSS ROCK BOULDERS UP TO 1,000 IBS EACH, AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

SUPREME LANDSCAPE PACKAGE
$84,211 AVG*
GENERAL INCLUSIONS:
LIMITED GROUND PREP, 35 PLANTS/SHRUBS, 350 LF OF EDGING, 35 CY OF ROCK/MULCH, EIGHT 2” TREES OF YOUR CHOICE, 4 SPRINKLER ZONES, 1 DRIP ZONE, 3,500 SF OF SOD, 1000 SF OF FLAGSTONE, 75 MOSS ROCK BOULDERS BETWEEN 1,000-2,500IBS EACH, AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

ULTIMATE LANDSCAPE PACKAGE
$119,705 AVG*
LIMITED GROUND PREP, 50 PLANTS/SHRUBS, 500 LF OF EDGING, 50 CY OF ROCK/MULCH, FIFTEEN 2” TREES OF YOUR CHOICE, 5 SPRINKLER ZONES, 2 DRIP ZONES, 3,500 SF OF SOD, 1000 SF OF FLAGSTONE, 125 MOSS ROCK BOULDERS BETWEEN 1,000-2,500IBS EACH, AND LABOR/EQUIPMENT FOR A FULL INSTALLATION
-

CUSTOMIZED LANDSCAPE PACKAGE
SELECT A PACKAGE OR SERVICE FROM OUR PRICING AS A BASELINE AND CUSTOMIZE YOUR QUANTITIES, SELECTIONS, AND MATERIALS,
-OR-
DESIGN FROM SCRATCH WITH
FREE ESTIMATES
-OR-
LET US DESIGN TO YOUR BUDGET
-

BOULDER LANDSCAPE PACKAGE
BOUDER WEIGHT APPROX 2,000±
BOULDERS DELIVERED AND PLACED LIMITATIONS APPLY
3 BOULDERS - $2,162*
5 BOULDERS - $3,028*
10 BOULDERS-$ 5,244*
15 BOULDERS-$7,235*
30 BOULDERS-$13,473*
45 BOULDERS-$18,746*
60 BOULDERS-$23,259*
75 BOULDERS-$26,806*
-

TIMBER AND BOULDER LANDSCAPE PACKAGE
PRICING COMING SOON
-

FLAGSTONE LANDSCAPE PACKAGE
PRICING COMING SOON
-

FENCE PACKAGE
PRICING COMING SOON
-

PROPERTY MAINTENANCE
GENERAL INCLUSIONS:
BASIC MOWING/BRUSH MOWING PACKAGE FOR SINGLE SERVICE. LABOR AND EQUIPMENT INCLUDED. PRICES ARE PER SERVICE, PER PROPERTY LOCATION. *SIGN UP FOR A MONTHLY MAINTENANCE SUBSCRIPTION PACKAGE AND TAKE 10% OFF OF BELOW PRICES.
½± ACRES = $145*
1± ACRES = $216*
2± ACRES = $298*
3± ACRES = $389*
4± ACRES = $453*
5± ACRES = $580*
6± ACRES = CONTACT US FOR A CUSTOM ESTIMATE
-

GRAVEL DRIVEWAY PACKAGE
GENERAL INCLUSIONS:
GROUND PREP POWER RAKE, 1” ROAD BASE DELIVERED AND SPREAD. CAMPACTION TO OCCUR NATURALLY. LABOR AND EQUIPMENT INCLUDED. NO EXPORT OF EXISTING SOIL/ROCK REMOVED FOR NEW GRAVEL. 1” ROADMIX TO BE MIXED/SPREAD ON TOP OF EXISTING. GEOFABRIC CAN BE INCLUDED FOR AN ADDITIONAL FEE.
20 CUBIC YARD DRIVEWAY - $2,996* (APPROX. 20’X75’X4” THICK)
30 CUBIC YARD DRIVEWAY - $3,957* (25’X100’X4” THCIK)
40 CUBIC YARD DRIVEWAY - $4,825* (20’X150’X4” THICK)
50 CUBIC YARD DRIVEWAY - $5,784* (20’X200’X4”THICK)
CONTACT US FOR QUOTES WITH GEOFABRIC REQUEST
-

IRRIGATION ONLY PACKAGE
GENERAL INCLUSIONS:
TRENCHING, IRRIGATION PIPING, SPRINKLERS, VALVES, CONTROLLER, LABOR/EQUIPMENT
3 ZONES - $1,470/ZONE* (2,000 SF YARD)
4 ZONES - $1,425 /ZONE* (3,000 SF YARD)
5 ZONES - $1,350/ZONE* (4,000 SF YARD)
6 ZONES - $1,274/ZONE* (5,000SF YARD)
DRIP LINE ZONE - $500*
-

SOD ONLY PACKAGE
GENERAL INCLUSIONS:
FINE GRADING, LIMITED TOP SOIL, SOD, LABOR AND EQUIPMENT TO INSTALL
2,000 SF - $4,908* (50’X40’ AREA)
3,000 SF - $5,965* (50’X60’ AREA)
4,000 SF - $6,921* (50’X80’ AREA)
5,000 SF - $7,820* (50’X100’ AREA)
-

ROCK BED ONLY PACKAGE
GENERAL INCLUSIONS:
METAL EDGING, LANDSCAPE FABRIC, MID PRICE ROCK SELECTION, LABOR, MATERIAL, AND EQUIPMENT FOR FULL INSTALLATION. IRRIGATION IS NOT INCLUDED.
500 SF ROCK BED = 10CY OF ROCK/100 LF OF EDGING = $3,083*
750 SF ROCK BED = 15CY OF ROCK/150 LF OF EDGING = $4,398*
1000 SF ROCK BED = 20CY OF ROCK/200LF OF EDGING = $5,979*
1250 SF ROCK BED = 25CY OF ROCK/250LF OF EDGING = $7,294*
-

TREE ONLY PACKAGE
GENERAL INCLUSIONS:
2” DIAMATER TREES DELIVERED, PLANTED, BRACED, SOIL SUPPLEMENTS, LABOR AND EQUIPMENT TO INSTALL. IRRIGATION TO TREE IS NOT INCLUDED.
3 TREE PACKAGE - $2,122*
5 TREE PACKAGE - $3,448*
10 TREE PACKAGE - $6,723*
12 TREE PACKAGE - $8,015*
15 TREE PACKAGE - $9,952*
25 TREE PACKAGE - $16,409*
-

SHRUB AND TREE ONLY PACKAGE
GENERAL INCLUSIONS:
MID SIZE PLANTS/SHRUBS, 2” TREES, BRACING MATERIAL, SUPPLEMENTS, DELIVERY AND INSTALLATION
1O SHRUBS AND 3 TREE PACKAGE = $3,305*
25 SHRUBS AND 5 TREE PACKAGE = $5,973*
35 SHRUBS AND 8 TREE PACKAGE = $8,355*
40 SHRUBS AND 12 TREE PACKAGE = $11,971*
50 SHRUBS AND 15 TREE PACKAGE = $15,107*
-

FRENCH DRAIN PACKAGE
PRICING COMING SOON
-

OPERATED SKID STEER
INCLUDES OPERATOR AND SKID STEER ONLY - ADD $55/HR PER EACH ADDITIONAL LANDSCAPER IF REQUIRED
$1,059* - 6 HOUR MINIMUM
$1,217* - 1 DAY (8 HOURS)
$1,890* - 2 DAYS (16 HOURS)
$2,788* - 3 DAYS (24 HOURS)
$3,686* - 4 DAYS (32 HOURS)
$4,585* - 5 DAYS (40 HOURS)
-

OPERATED MINI-EXCAVATOR
INCLUDES OPERATOR AND MNIEX ONLY - ADD $55/HR PER EACH ADDITIONAL LANDSCAPER IF REQUIRED
$950* - 6 HOUR MINIMUM
$1,116* - 1 DAY (8 HOURS)
$1,616* - 2 DAYS (16 HOURS)
$2,377* - 3 DAYS (24 HOURS)
$3,138* - 4 DAYS (32 HOURS)
$3,899* - 5 DAYS (40 HOURS)
-

OPERATED TRACTOR WITH MULTIPLE ATTACHMENTS
NCLUDES OPERATOR, VENTRAC TRACTOR, & 2 IMPLEMENTS ONLY - ADD $55/HR PER EACH ADDITIONAL LANDSCAPER IF REQUIRED. ADD $100/EACH ADDITIONAL IMPLEMENT REQUESTED/DAY.
$967* - 6 HOUR MINIMUM
$1,133* - 1 DAY (8 HOURS)
$1,633* - 2 DAYS (16 HOURS)
$2,391* - 3 DAYS (24 HOURS)
$3,149* - 4 DAYS (32 HOURS)
$3,913* - 5 DAYS (40 HOURS)
-

GENERAL LANDSCAPE LABOR
GENERAL INCLUSIONS:
4 HOUR MINIMUM ON LABOR WITHIN 29 MILES FROM THREE FORKS. MILEAGE BEYOND TO/FROM PROPERTY LOCATION IS NOT INCLUDED. NO DUMP FEES ON LABOR/TRUCK/DUMP RATE.
1) LABOR - NO MATERIAL, NO EQUIPMENT OR TOOLS
HOURLY LABOR RATE - $88*
2) TRUCK WITH STANDARD HAND TOOLS AND POWER TOOLS (SHOVEL/RAKE, TRIMMERS, CHAINSAWS ETC…)
HOURLY LABOR RATE - $101*
3) LABOR/WITH TRUCK AND DUMP TRAILER
HOURLY LABOR RATE - $107* (5’X10’)
-

PROPERTY CLEAN-UP
PRICING COMING SOON
-

TREE TRIMMING & REMOVAL
PRICING COMING SOON
-

LANDSCAPE MATERIAL DELIVERY
GENERAL INCLUSIONS:
TRAILER (SELECT DUMP OR FLAT TRAILER), TRUCK AND DRIVER INCLUDED. AVERAGE DELIVERY TRIP = 3 HOURS. MATERIAL COST/ DUMP FEES NOT INCLUDED. UNLOADING WITH SKID STEER OR FORKLIFT NOT INCLUDED.
$107* HOURLY - MINIMUM 2 HOURS
ADD $471* LUMP SUM FEE TO MOBILIZE SKID STEER FOR UNLOADING
-

SPRING CLEAN UP
$197* AVG
GENERAL INCLUSIONS:
COMPLETE MOWING, TRIMMING, AND GENERAL PROPERTY CLEAN UP. DOES NOT INCLUDE HEAVY DEBRIS REMOVAL.
CONTACT US 406-980-1866
CONTACT US 406-980-1866
Let us be “Your land improvment Partner! Fill out some info and we will be in touch shortly! We can't wait to hear from you!